Charlie's N Scale Layout

   8 September 2003

Mark, Eric and I drove over to meet with Charlie, Andrew and John for a run session at Charlie's. All had a very good time. I brought along my throttle and Andrew brought a couple so we had 5 throttles running at one time, this is a new "record" for Charlie. We tested Charlie's theory about how the layout will run. IT worked just fine with 5 operators.

I can see this layout supporting 6 or 8 operators. Two shuffling trains out from under the layout and up into the east and west bound helixes. Two to Four operators running the trains out of the helixes and across the layout. One dispatcher, and a couple of operators in the yards.   

Click on an image to see a larger view of the image.

1) #151 Coast Mail at Alegria Canyon.
2) #95 Lark at East Surf siding.
3) #371 Coast Merchandise West near Surf.
P9203518.JPG (49786 bytes) 4) Westbound freight on Gaviota siding.
P9203519.JPG (65702 bytes) 5) Charlie, Eric, and John, with the west helix in the foreground, Devon siding in the middle of the picture, and Ellwood in back.
P9203520.JPG (71887 bytes) 6) Andrew with Devon ,and the west Helix in the foreground. Surf is on the left, and Alegria is on the right.
P9203521.JPG (62319 bytes) 7) Eastbound freight crossing Gaviota beach at the start of the descent.
P9203522.JPG (101648 bytes) 8) #151 Coast Mail west of Gaviota.
P9203523.JPG (67109 bytes) 9) West bound freight near Alegria canyon.
10) A train passes through the Twilight Zone. This is where the ease and west ends of the layout come together.
P9203526.JPG (105022 bytes) 11) West staging,with Guadalupe at right background.
P9203525.JPG (104816 bytes) 12) Same view as picture 11 at a slightly different angle.
Page Last Updated 06/04/2010